Lateral Lateral Lining
- Home
- /Lateral Lateral Lining
Key Features:
The Performance Liner® Lateral System is a unique cured in-place process that allows the installer the freedom to position the liner anywhere in the pipe by inverting through a cleanout. The liner can be directed either upstream or downstream using LMK’s patented guide shoe. In addition, this versatile system is capable of being installed in pipes under foundations, inside walls or in vertical applications. LMK’s Lateral system is truly a no dig situation for renewing lateral pipes since the entire process can be completed through a cleanout. Gasket sealing O-rings are placed at the upstream and downstream ends of the liner providing a verifiable, non-leaking lateral liner that is compatible with all types of piping.
LMK’s lateral liners also include compressible material at the upstream end of the liner, producing a smooth tapered transition to the old pipe. This process renews laterals from 4-8 inches in diameter in continuous lengths up to 130 feet. Inversion tanks come in two sizes (36 inch or 18 inch) and are equipped with a camera port so the liner can be visually inspected under pressure for proper placement prior to the liner being cured.
ASTM F1216
Standard practice for rehabilitation of existing pipelines and conduits by the inversion and curing of a resin-impregnated tube.
Significance and Use
Purchase the full version of this standard by visiting the ASTM website here.
This practice is for use by designers and specifiers, regulatory agencies, owners, and inspection organizations who are involved in the rehabilitation of conduits through the use of a resin-impregnated tube inverted through the existing conduit. As for any practice, modifications may be required for specific job conditions.
1. Scope
- This practice describes the procedures for the reconstruction of pipelines and conduits (4 to 108-in. diameter) by the installation of a resin-impregnated, flexible tube which is inverted into the existing conduit by use of a hydrostatic head or air pressure. The resin is cured by circulating hot water or introducing controlled steam within the tube. When cured, the finished pipe will be continuous and tight-fitting. This reconstruction process can be used in a variety of gravity and pressure applications such as sanitary sewers, storm sewers, process piping, electrical conduits, and ventilation systems.
- The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.
- This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific precautionary statements, see 7.4.2.
2. Referenced Documents
ASTM Standards
- D1600 Terminology for Abbreviated Terms Relating to Plastics
- D3567 Practice for Determining Dimensions of Fiberglass (Glass-Fiber-Reinforced Thermosetting Resin) Pipe and Fittings
- D3839 Guide for Underground Installation of Fiberglass (Glass-FiberReinforced Thermosetting-Resin) Pipe
- D543 Practices for Evaluating the Resistance of Plastics to Chemical Reagents
- D5813 Specification for Cured-In-Place Thermosetting Resin Sewer Piping Systems
- D638 Test Method for Tensile Properties of Plastics
- D790 Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials
- D903 Test Method for Peel or Stripping Strength of Adhesive Bonds
- E797 Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
- F412 Terminology Relating to Plastic Piping Systems
AWWA Standard
- ManualonCleaningandLiningWaterMains,M28
NASSCO Standard
- RecommendedSpecificationsforSewerCollectionSystemRehabilitation
Index Terms
Resin-impregnated tube; Resins; Sewer pipe (thermoplastic); Thermosetting plastic pipe/tubing/fittings; Steel pipe; Styrene; Underground installation-water supply/distribution systems; Water supply/distribution systems; Bypassing; Conduit joining system; Conduits; Curing (in pipeline/conduit rehabilitation); Drainage materials/systems; Drain/waste/vent (DWV)-thermoplastics; Epoxy resin pipe fittings; Epoxy resins; Gravity sewer pipe; Inspection; Inversion; Land drainage piping systems; Nonpressure piping; Polybutylene (PB) pipe; Polyethylene (PE) conduit; Polyethylene (PE) pipe; Poly(vinyl chloride)(PVC) conduits; Pressure pipelines/piping systems; Rehabilitation-sewerlines; Reinforced thermosetting-resin pipe (RTRP); ICS Number Code 23.040.20 (Plastic pipes)
DOI
10.1520/F1216-09
For a copy of the ASTM F1216-06 Standard please visit www.astm.org
Resin, Promoter and Catalyst Information
Liner and Bladder Information
Case Studies and Articles
Insignia Gasket Sealing Technology
The Myth, the Fact and the Legend: Insignia Hydrophilic Sealing System
Sahar Hasan, Applications Engineer and Kristina Kiest, Director of Marketing
Published in Trenchless International Magazine, October 2012
Gasket Sealing Technology: A Solution to Sealing Deficiencies in Cured in-Place Pipe Lining
Kristina Kiest and John Vose
Presented at NASTT No-Dig March 2012
T-Liner Main-To-Lateral Connection And Vac-A-Tee Cleanout
A Comprehensive Understanding of ASTM F3097-15 “Standard Practice for Installation of an Outside Sewer Service Cleanout through a Minimally Invasive Small Bore Vacuum Excavation”
Rick Gage and Amana Arayan
Presented at NASTT No-Dig March 2016
Sealing the Connection for Large Diameter Pipes, Trenchlessly
Mike Czipar and Amana Arayan
Presented at NASTT No-Dig March 2016
Rehabilitation of the Coral Gables Wastewater Collection System
Sahar Hasan, Mark Gulyas, and Jorge Acevedo
Presented at NASTT No-Dig April 2014
A Technique for Renewing a Section of Mainline Pipe while Simultaneously Renewing Multiple Service Lateral Pipes through the Use of Continuous CIPP
Larry Keist and Sahar Hasan
Presented at NASTT No-Dig 2012
Lining Laterals in Las Olas
Kristina Kiest
Published in Trenchless Technology Magazine, October 2010
A Comprehensive Understanding of ASTM F2561-06 “The Standard Practice for Rehabilitation of a Sewer Service Lateral and its Connection to the Main Using a One-Piece Main and Lateral Cured-in-Place Liner.”
Larry Kiest, Jr. and Rick Gage
Presented at NASTT No-Dig March/April 2009
Trenchless Technologies; Quicker, Cleaner, Greener and Cheaper Ways to Get the Job Done
Kristina Breese
Published in the Professional Engineer, Spring 2008
Multiple Technologies – Maximum Flow Reduction
Northcrest-Afton Sewer Rehabilitation Project, New Castle County, Delaware
James W. Shelton and Michael T. Harmer
Presented at Mediterranean No-Dig, September 2007
The Lateral Lining Market Has Arrived: Lateral Work is Being Completed in All Corners of the World with More on the Way
Joan Blythe
Published in Trenchless Technology Magazine, April 2007
Trenchless Rehab from the Engineer’s Perspective
James W. Shelton
Published in Trenchless Technology Magazine, October 2006
Prince William County Service Authority Project Case Study
Shaun Flannery and Larry Kiest, Jr.
Published 2005
Wisconsin Raises the Bar Utilizing T-Liner
Shaun Flannery
Published 2003
Fighting the Tide; Installing and Rehabilitating Sewers Using Trenchless Techniques; Boston Water & Sewer Commission
Irene McSweeney Woodfall, P.E. and Michael Oliveira
Conference Proceedings, NASST No-Dig 2000
A Case Study In Infiltration Reduction through Trenchless Technology
South Palos Township Sanitary District, Cook County, Illinois
Aaron E Fundich, P.E. and Larry W. Kiest, Jr.
Published March 1999
Lateral Lining
Local Ordinances Dictate Lateral Renewal Technologies
Larry Kiest and Rick Gage
Presented at NASTT No-Dig 2010
Portland BES Advances in Sewer Maintenance and Repairs by Operating Multiple CIPP Crews
Joe Dvorak and Larry Kiest, Jr.
Presented at NASTT No-Dig April 2007
Criteria for an Effective Lateral Renewal Project Utilizing Trenchless Technology
Larry Kiest
Presented at American Society of Civil Engineers (ASCE), New Pipeline Technologies, 2003
Lateral Thinking
Keith Gribbins
Published in Trenchless Technology Magazine, April 2002
Sectional Spot Repair
Steam Cured Large Diameter CIPP Sectional Liners Make Fast Repairs in Sensitive Environmental Areas
Joan Blythe
Published October 2012
Siphon Spot Repairs in Tampa
Larry Kiest, Jr.
Published October 2010
CIPP Sectional/Point Repairs; Critical Factors – Finally Explained
Shaun Flanery
Published May 2010
Lined Main Tap
Every Lateral in Dane County gets a new Connection Using the LMK Lined Main Tap
Kristina Kiest and Larry Kiest
Published February 2011
Manhole
The Most Cost Effective Method for Eliminating Inflow
Larry Kiest
Presented at American Society of Civil Engineers (ASCE), Pipelines, 2006
Research
The Inspector is the Gatekeeper to a Successful CIPP Installation
Larry Kiest, Gerry Muenchmeyer, and Amana Arayan
Presented at NASTT No-Dig 2015
Protocols for the Quantification of Water-Tightness of a Rehabilitated Main/Lateral Sewer Connection
Rick Gage
Presented at NASTT No-Dig March 2011
Making it Stick; Contractors repairing sewer laterals with CIPP linings need to consider multiple factors that affect the quality of the lateral-to-main connection
Larry Kiest, Jr.
Published at the Pumper & Cleaner Environmental Expo International, February 2006
Verifiable Non-Leaking Connection Where No Water Migrates
Larry Kiest and Shaun Flanery
Presented at NASTT No-Dig 2005
Testing Top Hat Liners and Robotic Systems for Repair of Lateral Connections
Dr. -Ing. Bert Bosseler and Dipl.-ing. Gunther Kaltenhauser
IKT – Institute for Underground Infrastructure, Published June 2004
Announcements
Tech Team Corner: Episode 1 – Lateral Lining Launch Tank – Outer Launch Tank
Tech Team Corner: Episode 2 – Lateral Launch Tank – Unique Safety Features
Tech Team Corner: Episode 2, Part 2 – Lateral Launch Tank – Mounted Components
Tech Team Corner: Episode 3 – Camera Port
Tech Team Corner: Episode 3, Part 2 – Camera Port Accessories
Tech Team Corner: Episode 4 – Interior Features
Tech Team Corner: Episode 5 – Transporting and Maneuvering the Launch Tank
Tech Team Corner: Episode 6, Part 1 – Accessories and Tools
Tech Team Corner: Episode 6, Part 2 – Accessories and Tools
Tech Team Corner: Episode 7 – Lateral Launch Tank Conclusion
Tech Team Corner: Episode 8 – Power Cure Mini Steamer
Tech Team Corner: Special Edition – Lateral Lining Post Installation with Fuquay Inc.