Search
Close this search box.

T-Liner Stubby Ambient & Steam Cure

MAIN TO LATERAL CIPP CONNECTION

the stubby

extends 6 inches up lateral

t-liner system

LMK’s T-Liner® Stubby Liner system extends up the lateral pipe 6 inches and provides a full-circle; one-piece structural connection with Insignia® hydrophilic compression gasket sealing.

STUBBY PACKERS AND ACCESSORIES

  • (2) Lateral Packer Flow Through for 8″ main
  • (2) Lateral Packer Flow Through Style – Suitable for mains with a diameters of 10-12 inches
  • (1) Lateral Packer Flow Through Style 12″-16″ Flow through Packer
  • (3) STUBBY™ TEE Shaped Bladder (Bladder to be mounted on packers listed above)
  • (6) Airhose Drum for Packers (Drum with Airhose 4mm 150′ length)
  • (2) 315 Air Gauges

training & certification

  1. License Fee per Territory (State), T-Liner
  2. Training, Charge per Day, T-Liner, In-House at LMK’s Facility. Minimum 4 training days required. Trainees: Minimum 4, Maximum 8. LMK will provide all necessary training materials. Continental breakfast and lunch will also be provided. 2 Trainers
  3. Training, Charge per Day, T-Liner, at Customer Location/Jobsite. Minimum 4 training days required. Trainees: minimum 4, maximum 8. Field Training must be scheduled to occur within 60 days from In-House Training. 2 Trainers
  4. Travel Expenses for LMK Technicians/Trainers – Airfare (Economy or Coach) and/or Rental Car – will be added to order when travel is completed
  5. (2) Travel Mobilization Time / per Trainer – Within Continental US